J-PARC E10 and E22 Experiments

General

We aim to perform experiments with the K1.8 beam line of the 50 GeV proton-synchrotron facility at J-PARC. The high intensity pion beams by the slow beam extraction will be used. Our subjects are a copious production of the neutron-rich hypernuclei by the double-charge exchange (DCX) reactions (E10) and a detail study on the non-mesonic weak decay in the A=4 hypernuclei (E22).

E10: Study of Neutron-Rich Lambda Hypernuclei

Proposal and PAC presentation

  • P10-1: Production of Neutron-Rich Lambda-Hypernuclei with the Double Charge-Exchange Reaction ( PDF )
  • PAC presentation in January 2007 by A. Sakaguchi ( PDF )
  • PAC presentation in July 2012 by A. Sakaguchi ( PDF
  • PAC presentation in January 2013 by A. Sakaguchi ( PDF )
  • PAC presentation in September 2013 by A. Sakaguchi ( PDF )

FIFC report and presentation

  • Report on technical issues for E10 experiment ( PDF )
  • FIFC presentation ( PDF )
  • QandA ( PDF )

E22: Study of Weak Decay of Lambda Hypernuclei

Proposal and PAC presentation

  • P10-2: Exclusive Study on the Lambda N Interaction in A=4 Lambda-Hypernuclei ( PDF )
  • PAC presentation in January 2007 by S. Ajimura ( PDF )

Information

Talks

  • HYP2015 in Sendai, 7 September, 2015 ( Presentation )
  • Workshop on Exotic Hadrons and Strangeness Nuclear Physics across the Date Line in Hawaii, 6 October, 2014 ( Presentation )
  • KEK theory center workshop on J-PARC hadron physics in 2014 in Tokai, 10-12 February, 2014 ( Presentation )
  • NUFRA2013 in Kemer, 29 September - 6 October, 2013 ( Presentation )
  • 2nd Korea-Japan Workshop on Nuclear and Hadron Physics at J-PARC in Pusan, 24-25 September, 2012 ( Presentation )
  • SNP12 in Osaka, 27-30 August, 2012 ( Presentation )
  • SENDAI08 in Sendai, 15-17 December, 2008 ( Presentation, Report )
  • NP08 in Mito, 5-7 March, 2008 ( E10, E22 )
  • RCNP Workshop in Osaka, 11-12 November, 2007 ( Presentation, Report )
  • NP@J-PARC in Tokai, 1-2 June, 2007 ( PDF )

E10/E22 official site

Documents before proposal approval

Layout based on Compass/Autoprefixer/Susy and powered by Lightbox